Construction monitoring (CM) is increasingly required, but there are a number of levels to choose from and it can be hard to understand which one is needed and when. Not to mention who is responsible for choosing the correct level. In addition, as CM levels increase, the lines between CM and quality control also blur.
To help make these aspects of CM clearer, we’ve collated our top three performing articles in one place.
- Making Sense of Producer Statements and Construction Monitoring
- Understanding Construction Monitoring Levels for Interior Engineering
- If I have a PS4, Do I need Quality Control
PRODUCER STATEMENTS AND CONSTRUCTION MONITORING
Engineers use their expertise to ensure the right materials have been selected to ensure the building will be fit for purpose. This is documented in a Producer Statement. You can read more about Producer Statements here.
Construction Monitoring is the on-the-ground checking of the construction process as it takes place. It is done by a specialist (usually an engineer) and adds value where specialist knowledge is required. The purpose is to ensure that an engineering design is understood correctly and built accordingly. You can read more about construction monitoring, including a description of the levels in the full article here.
UNDERSTANDING CONSTRUCTION MONITORING LEVELS FOR INTERIOR ENGINEERING
There are five levels of construction monitoring. The CM level varies from project to project, and the level is chosen based on factors such as project size, importance, complexity and the skill or experience of the constructor. To understand what is included at each level and to understand which types of projects typically choose which level, you can read the full article here.
UNDERSTANDING THE DIFFERENCES BETWEEN A PS4 AND QUALITY CONTROL
The confusion between a PS4 and Quality Control arises because there is some overlap on the types of things that are checked. However, they are checked for different purposes and for different authorities. When higher levels of construction monitoring are employed, it can become a grey area. This article outlines when construction monitoring begins to overlap quality control and discusses how the engineer and builder relationship plays a part in choosing the correct level of construction monitoring.
If you would like more information on construction monitoring, or would like to discuss a project with us, please get in touch.
A Unified Step Forward: Strengthening Seismic Resilience in Building Design
Two key documents, the AWCI Code of Practice for Suspended Ceilings and the BIP Code of Practice for the Seismic…
How to handle seismic rating for existing fit-out and building code compliance for new fit-out
Managing seismic safety in building projects can be complex, especially when dealing with both new and existing…
Understanding the 2024 Updates to the AWCI Code of Practice for Suspended Ceilings
What are the key updates to the 2024 AWCI Code of Practice for suspended ceilings? As discussed by Matt Bishop and Gye…